Heavy Industrial
Soma Kolin Thermal Power Plant – Reinforced Concrete Chimney and Structures
Client
Soma Kolin Termik Santrali
Location
Manisa (Soma)
Türkiye
Year
2017
Structure Type
Heavy Industrial
FlagshipScope of Work
- ▪Reinforced concrete chimney shaft (tapered slipform)
- ▪Twin steel flue fabrication and erection
- ▪Heavy lifting operations with strand jacks (4x70 tons)
- ▪Steel platforms and decks
- ▪On-site steel fabrication, sandblasting, and painting
- ▪Borosilicate brick installation
- ▪Auxiliary structures and silos
- ▪Cooling towers (conventional formwork)
Construction of a 208-meter-high reinforced concrete chimney with twin steel flues at Soma Kolin Thermal Power Plant, including detailed engineering. Two steel flue liners with a diameter of approximately 6.5 meters were fabricated and installed using strand jack systems. Steel platforms and equipment were lifted using 4x70-ton strand jacks. Due to transportation limitations, a temporary on-site workshop was established for fabrication, sandblasting, and painting of large steel components.