Heavy Industrial
Maritza İztok East 1 Thermal Power Plant – Cooling Tower and Silo Structures
Client
Maritza İztok Doğu 1 Termik Santrali
Location
Galabovo
Bulgaria
Year
2007
Structure Type
Heavy Industrial
Scope of Work
- ▪Hyperbolic cooling tower (hydraulic climbing slipform)
- ▪Elevator towers (vertical slipform)
- ▪Ash, fly ash and gypsum silos (vertical slipform)
- ▪Bunker, foundation and conventional concrete works
- ▪All site execution works
Construction of reinforced concrete structures including a 135-meter-high hyperbolic cooling tower, elevator towers, and ash, fly ash, and gypsum silos at the 2x300 MW Maritza Iztok East 1 Thermal Power Plant in Galabovo, Bulgaria. The cooling tower was constructed using hydraulic climbing slipform system, while elevator towers and silos were built using vertical slipform method.